Subject: Planned Maintenance Notification: PLC Replacement in Power Room A, 25th July
Scheduled on 25/07/2026 08:00:00 Status Completed Maintenance Estimated finish 25/07/2026 20:00:00Dear Customer,
We are writing to inform you of scheduled maintenance affecting equipment within our facility. Please see the details below.
What
–––––
During our daily infrastructure checks, a fault was identified with a Programmable Logic Controller (PLC) in Power Room A. As a precautionary measure, the affected PLC is scheduled to be replaced.
Throughout the works, Power Room B will remain fully operational, and our standby generators are configured to hold the full building load without issue. As a result, the risk of any power loss to client servers is considered minimal.
Where
–––––
Power Room A at our data centre facility. Power Room B and all associated infrastructure will continue to operate as normal.
When
–––––
Saturday 25th July, between 08:00 BST and 20:00 BST.
The replacement itself is expected to take no longer than two hours. However, we have allocated the full window from 08:00 to 20:00 to allow for any unforeseen circumstances and to ensure the work is completed safely and without haste.
We do not anticipate any service interruption during this period. Should you have any questions or concerns, please do not hesitate to contact our operations team, who will be happy to assist.
Thank you for your continued trust in our services.
Kind regards,
Operations Team
BLYNX AIM
Related servers / services
| Date | Action |
|---|---|
| 13/07/2026 12:10:00 | Dear customer, A correction to our previous message. It will be on Saturday, 25th of July, between 08:00 BST and 20:00 BST, not Wednesday. Apologies for any confusion this may have caused. Kind regards, Operations Team BLYNX AIM |
| 25/07/2026 09:12:00 | Dear Customer, We're writing to confirm that our engineers are now on-site to replace the affected component in Power Room 1. As part of this work, mains incoming power from the grid to Power Room 1 will be switched off for the duration of the replacement. During this time, the A feed to all racks will continue to be provided via our UPS and diesel generator, ensuring continuity of supply throughout. We will notify you as soon as the work is complete and mains power has been restored. If you have any questions in the meantime, please don't hesitate to get in touch. Kind regards, BLYNX AIM Operations Team |
| 25/07/2026 12:47:00 | Dear Customer, We're writing to confirm that the affected component in Power Room 1 has now been successfully replaced and tested (including full load from UPS and generator). Mains incoming power from the grid has been restored to Power Room 1, and all racks are back on normal utility feed. The maintenance window is now closed. Thank you for your patience while this work was carried out. If you have any questions, please don't hesitate to get in touch. Kind regards, BLYNX AIM Operations Team |