At Risk: Power Feed A, Saxon House

Finished Scheduled on 01/11/2026 09:05:00
We are currently investigating an issue with the UPS that supplies Power Feed A at Saxon House. Earlier this morning the UPS had an event that caused a brief loss of power on Feed A, and it has happened again just now. Power Feed B is not affected.

Our technicians are investigating with the UPS manufacturer. While this work goes on, Power Feed A is classed as At Risk.

Equipment connected to both Feed A and Feed B should not be affected. If any of your equipment is powered from Feed A only, it may lose power again. Please check that any equipment with dual power supplies is connected to both feeds. If you need help with this, or would like us to check your rack, please let us know.

We will send a further update when we have more information or when the issue is resolved.

Kind regards,
Network Operations
Blynx AIM Limited
Related servers / services:
Date Action
01/11/2026 11:15:00 An engineer is on site and has confirmed a fault with the UPS that supports Power Feed A. The UPS has been placed into internal bypass while the fault is investigated. Power Feed A therefore remains live, but it is not currently protected by the UPS and could be affected by any disturbance on the incoming mains supply.

Power Feed B is not affected and remains fully supported by its own UPS.

Power Feed A is classed as At Risk until a fix has been put in place. If your equipment has dual power supplies, please make sure it is connected to both Feed A and Feed B. If you would like us to check your rack, please let us know.

We will send a further update once the repair has been carried out.

Kind regards,
Network Operations
Blynx AIM Limited
02/11/2026 13:06:00 Good aftwernoon,

The fault with the UPS supporting Power Feed A has not yet been fully isolated. We have narrowed it down to a charging fault, which could be caused by the UPS hardware or by a cell issue in the battery strings.

Further tests are being carried out to isolate the cause so that a fix can be planned.

Power Feed A continues to be classed as At Risk. Power Feed B is not affected and remains fully supported by its own UPS.

We will send a further update once the cause has been confirmed and a fix is planned.

Thank you for your patience and understanding while we work to isolate the issue and put it right.

Kind regards,
Network Operations
Blynx AIM Limited
02/11/2026 15:01:00 Good afternoon,

Testing has confirmed that the fault is with the batteries supporting the UPS on Power Feed A, not the UPS hardware. Batteries have failed in both of the UPS’s battery strings. All of the batteries passed full testing at the end of April, so this failure was unexpected.

As the batteries are all the same age, we have decided to replace both UPS-A sets. This will take time to arrange, so as a temporary measure our engineers are testing the remaining batteries to build a single healthy string. This should allow us to return the UPS to service and provide some protection until the replacements arrive.

This is a temporary fix and we cannot guarantee it. A single string will reduce the UPS runtime, but it should still provide 20 to 30 minutes depending on the load at the time. The UPS only needs to support the load through brownouts and while the generators start during a power outage.

We plan to return the UPS to service outside standard office hours today and will update you shortly before we begin. Power Feed A will remain classed as At Risk until all of the batteries have been replaced. Power Feed B is not affected and remains fully supported by its own UPS.

Thank you for your continued patience and understanding.

Kind regards,
Network Operations
Blynx AIM Limited
02/11/2026 17:31:00 Our engineers are now preparing to bring the UPS supporting Power Feed A back online, using the temporary single battery string.

Power Feed A remains classed as At Risk during this work and until all of the batteries have been replaced. Power Feed B is not affected and remains fully supported by its own UPS.

We will update you once the work is complete.

Regards
Network Operations
Blynx AIM Limited
02/11/2026 18:06:00 Good evening,

The UPS supporting Power Feed A is back online and is charging its batteries back to 100%, which it could not do with the faulty batteries in place. It is operating at reduced capacity on a single battery string.

The batteries in this string passed our testing. However, they are the same age and type as those that failed and have been running in the same system. Power Feed A therefore remains classed as At Risk until all of the batteries have been replaced.

Power Feed B is not affected and remains fully supported by its own UPS.

We are sourcing the new batteries and intend to place the order by the end of day tomororw, Tuesday 3rd Novermber. We will update you again once we have an expected delivery date.

Thank you for your continued patience and understanding.

Kind regards,

Huw Thomas
Network Operations
Blynx AIM Limited
09/11/2026 10:42:00 Good morning,

The replacement batteries for both strings have arrived and are being racked by our technicians today.

To bring them into service the UPS needs to be taken offline briefly on two occasions, once to replace the current string with the first new string, and again to bring the second string online. We do not expect any interruption to your power during either changeover.

While the UPS is offline for those two short periods, Power Feed A will be running without UPS protection and would therefore be exposed to any disturbance on the incoming mains supply. Power Feed B is unaffected throughout and keeps its protection at all times.

Once both strings are in service we will monitor them, and we will arrange a full load test on a date we will confirm with you separately.

Thank you for your patience and understanding while we have worked through this. If you have any questions, please let us know.

Regards
DataCentre Operations
Blynx AIM Limited
11/11/2026 22:51:00 Good evening,

The two strings have now been in operation with no erros for 2 days. The previous erros taht were seen have cleared and the UPS are reporting good batteries connected.

We will plan a full load test at a later date.

Many thanks for your patience and understadning while we worked to rectify the failure on the UPS

Regards