<title>{"english":"Notification of Planned Work: C01729342","portuguese-br":"","german":""}</title>
<link>status/30/--english---notification-of-planned-work--c01729342---portuguese-br------german-----/</link>
<guid>status/30/--english---notification-of-planned-work--c01729342---portuguese-br------german-----/</guid>
<pubDate>Tue, 05 May 2026 00:00:00 +0100</pubDate>
<description><![CDATA[{"english":"Dear client,\r\n\r\nWe have been notified of network maintenance which will be taking place with our third-party supplier, on the circuit between Saxon House, Cheltenham and Telehouse North, London.\r\n\r\nMaintenance Ref C01729342\r\n\r\nThe service will be at risk for the following period:\r\nStart Time: 07\/05\/2026 22:00\r\nEnd Time: 08\/05\/2026 08:00\r\nService Affecting: estimated up to six hours of outage.\r\n\r\nImpact:\r\nThere will be an impact to services between Cheltenham and London as outlined above. The impact will take place at some point during the timeframe stated above whilst technicians complete the maintenance work.\r\n\r\nThe service outage should only last for up to six hours; however, an ten-hour timeframe has been given in the event of any unforeseen circumstances.\r\n\r\nNo services will be taken down until 00:01\r\n\r\nPlease note that Saxon House benefits from diverse Colt connectivity, which will maintain internet connectivity at the site throughout this maintenance window.\r\n\r\nReason:\r\nThis work is required to replace a fibre joint within the Virgin Media O2 network, ensuring it meets current standards and improves overall network performance and reliability.\r\n\r\nVirgin Media O2 and Blynx AIM would like to apologise for any inconvenience caused by this maintenance.\r\n\r\nKindest regards,\r\nBlynx AIM NOC Team","portuguese-br":"","german":""}]]></description>
</item>
<item>
<title>{"english":"Scheduled Network Maintenance: 34359032","portuguese-br":"","german":""}</title>
<link>status/34/--english---scheduled-network-maintenance--34359032---portuguese-br------german-----/</link>
<guid>status/34/--english---scheduled-network-maintenance--34359032---portuguese-br------german-----/</guid>
<pubDate>Wed, 29 Apr 2026 00:00:00 +0100</pubDate>
<description><![CDATA[{"english":"Dear customer,\r\n\r\nWe have been notified that our transit supplier for Saxon House is planning emergency scheduled maintenance to replace a damaged fibre within their network. This will reduce redundancy at Saxon House.\r\n\r\nWhat?\r\nColt intends to carry out internal maintenance within its network. This has been designated as an EMERGENCY. The nature of this work is to perform traffic-affecting work in order to rectify a fault. Outage: 6 hours\r\n\r\nWhy?\r\nWork is required to replace a damaged section of cable under controlled conditions to avoid a longer unplanned outage to services should it fail unexpectedly. \r\n\r\nWhere?\r\nThree circuits from Saxon House, Cheltenham to London. \r\n\r\nWhen?\r\nStart: 2026-04-30 23:00 GMT\r\nEnd: 2026-05-01 05:00 GMT\r\n\r\nNo service interruption is expected at the Saxon House data centre during this maintenance window. However, all network services should be considered at risk for the duration of the maintenance window. All efforts will be made to keep any disruption to an absolute minimum.\r\n\r\nDo I need to do anything?\r\nNo action is required on your part. We recommend that you make your technical teams aware of the maintenance window as a precaution.\r\n\r\nWe apologise for any inconvenience this may cause and thank you for your patience. If you have any questions, please don't hesitate to contact us.\r\n\r\nRegards\r\nNetwork Operations Team\r\nBlynx AIM Ltd.","portuguese-br":"","german":""}]]></description>
</item>
<item>
<title>{"english":"Notification of Planned Work: C01718503 - Impact Revised","portuguese-br":"","german":""}</title>
<link>status/31/--english---notification-of-planned-work--c01718503---impact-revised---portuguese-br------german-----/</link>
<guid>status/31/--english---notification-of-planned-work--c01718503---impact-revised---portuguese-br------german-----/</guid>
<pubDate>Fri, 24 Apr 2026 00:00:00 +0100</pubDate>
<description><![CDATA[{"english":"Dear client,\r\n\r\nWe have been notified of network maintenance which will be taking place with our third-party supplier, on the circuit between Saxon House, Cheltenham and Telehouse North, London.\r\n\r\nMaintenance Ref C01718503\r\n\r\nThe service will be at risk for the following period:\r\nStart Time: 24\/04\/2026 22:00\r\nEnd Time: 25\/04\/2026 08:00\r\nService Affecting: estimated up to six hours of outage.\r\n\r\nImpact:\r\nThere will be an impact to services between Cheltenham and London as outlined above. The impact will take place at some point during the timeframe stated above whilst technicians complete the maintenance work.\r\n\r\nThe service outage should only last for up to six hours; however, an ten-hour timeframe has been given in the event of any unforeseen circumstances.\r\n\r\nPlease note that Saxon House benefits from diverse Colt connectivity, which will maintain internet connectivity at the site throughout this maintenance window.\r\n\r\nReason:\r\nThis work is required to replace a fibre joint within the Virgin Media O2 network, ensuring it meets current standards and improves overall network performance and reliability.\r\n\r\nVirgin Media O2 and Blynx AIM would like to apologise for any inconvenience caused by this maintenance.\r\n\r\nKindest regards,\r\nBlynx AIM NOC Team","portuguese-br":"","german":""}]]></description>
</item>
<item>
<title>{"english":"Reduced Redundancy Network Status 20260422\/1","portuguese-br":"","german":""}</title>
<link>status/33/--english---reduced-redundancy-network-status-20260422--1---portuguese-br------german-----/</link>
<guid>status/33/--english---reduced-redundancy-network-status-20260422--1---portuguese-br------german-----/</guid>
<pubDate>Wed, 22 Apr 2026 00:00:00 +0100</pubDate>
<description><![CDATA[{"english":"Dear customer,\r\n\r\nAt 15:10 BST today, we posted an initial notification on our customer portal following detection of a network related event. Portal notifications are only visible to customers who actively check the portal and do not trigger any outbound alerts.\r\n\r\nNow that Lumen have confirmed an issue on the fibre network between Newport and Swindon that may take some time to locate and rectify, we are upgrading this to a ticketed, notified incident to ensure all customers are kept directly informed as the situation develops.\r\n\r\nLumen have confirmed that a fault on the fibre network between Newport and Swindon has resulted in the loss of one of our redundant transit connections.\r\n\r\nPlease be assured that this incident affects only a single leg of our transit infrastructure. All other transit connections remain fully operational, and the data centre retains full internet visibility and connectivity. There is no direct impact to customer services; however, as we are currently operating with reduced redundancy, this situation is classed as \"At Risk\" until the affected circuit is restored.\r\n\r\nLumen confirmation details:\r\n\r\nIncident Reference: 34309730\r\nLocation: Newport, United Kingdom to Swindon, United Kingdom\r\nSeverity: P2\r\nServices Impacted: 110\r\nCustomers Impacted: 41\r\nStart Time: 22\/04\/2026 14:07 GMT (15:07 BST)\r\n\r\nWe will continue to provide updates directly via this ticket as we receive them from Lumen.\r\n\r\nRegards\r\nNetwork Operations Team\r\nBlynx AIM Ltd.","portuguese-br":"","german":""}]]></description>
</item>
<item>
<title>{"english":"Reduced Redundancy Network Status 20260422\/1","portuguese-br":"","german":""}</title>
<link>status/32/--english---reduced-redundancy-network-status-20260422--1---portuguese-br------german-----/</link>
<guid>status/32/--english---reduced-redundancy-network-status-20260422--1---portuguese-br------german-----/</guid>
<pubDate>Tue, 21 Apr 2026 00:00:00 +0100</pubDate>
<description><![CDATA[{"english":"Dear client,\r\n\r\nWe are writing to advise you of a partial outage affecting one of the two circuit paths supplying Saxon House, Cheltenham to London, provided by our third-party carrier, Colt.\r\n\r\nDue to the diverse connectivity in place at this site, internet connectivity remains fully active at this time.\r\n\r\nOur team is actively monitoring the situation and working with Colt to restore full circuit capacity. We will provide a further update as soon as more information is available.\r\n\r\nWe apologise for any inconvenience this may cause and thank you for your patience.\r\n\r\nStart Time: 15:10 22\/04\/2026\r\nEnd Time: ongoing\r\n\r\nService Affecting: AT RISK\r\n\r\nKindest Regards,\r\nBlynx AIM NOC Team","portuguese-br":"","german":""}]]></description>
</item>
<item>
<title>{"english":"Planned Maintenance Notification \u2014 Upstream Backhaul (Ref: C01704427)","portuguese-br":"","german":""}</title>
<link>status/29/--english---planned-maintenance-notification--u2014-upstream-backhaul--ref--c01704427----portuguese-br------german-----/</link>
<guid>status/29/--english---planned-maintenance-notification--u2014-upstream-backhaul--ref--c01704427----portuguese-br------german-----/</guid>
<pubDate>Thu, 09 Apr 2026 00:00:00 +0100</pubDate>
<description><![CDATA[{"english":"Dear Customer,\r\n\r\nWe have just been informed at short notice by our carrier of a scheduled maintenance window affecting one of our upstream backhaul circuits between Blynx AIM (Saxon House, Cheltenham) and Telehouse, London. We apologise for the lack of advance notification on this occasion.\r\n\r\nMaintenance Details\r\n\r\nReference: C01704427\r\nCarrier: Virgin Media Business\r\nStart: 10\/04\/2026 22:00 BST\r\nEnd: 11\/04\/2026 10:00 BST\r\nStatus: Scheduled\r\n\r\nReason for Works\r\n\r\nVirgin Media will be carrying out essential maintenance on a section of a longer circuit that forms part of our backhaul between Saxon House and Telehouse. There will be a degradation or loss of service on this specific path whilst the work is completed.\r\n\r\nCustomer Impact\r\n\r\nCustomers with backhaul services between Telehouse and Saxon House may be affected during the maintenance window.\r\n\r\nCustomers within the Blynx AIM (Saxon House) data centre consuming transit are not expected to see any impact. Our primary transit is delivered via multiple diverse 100G connections from Colt and Lumen, and the Virgin Media circuit under maintenance serves only as an additional redundancy path. Primary transit services will continue to operate as normal throughout the works.\r\n\r\nAction Required\r\n\r\nNone. This notification is for your awareness only.\r\n\r\nIf you have any questions or concerns, please contact the Blynx AIM NOC.\r\n\r\nKind regards,\r\nOperationsTeam\r\nBlynx AIM Limited","portuguese-br":"","german":""}]]></description>
</item>
<item>
<title>{"english":"Rescheduled Power Maintenance \u2014 Saxon House \u2014 At Risk Period \u2014 7th April 2026","portuguese-br":"","german":""}</title>
<link>status/28/--english---rescheduled-power-maintenance--u2014-saxon-house--u2014-at-risk-period--u2014-7th-april-2026---portuguese-br------german-----/</link>
<guid>status/28/--english---rescheduled-power-maintenance--u2014-saxon-house--u2014-at-risk-period--u2014-7th-april-2026---portuguese-br------german-----/</guid>
<pubDate>Tue, 07 Apr 2026 00:00:00 +0100</pubDate>
<description><![CDATA[{"english":"We have been notified by National Grid that they will be carrying out planned maintenance on the electricity substation serving Saxon House on Tuesday 7th April 2026 between 07:00 and 09:00. This maintenance was previously scheduled for Friday 27th March 2026 and is now rescheduled following the cancellation of that window. During this work, mains power to the facility will be temporarily disconnected, with an expected outage of up to 30 minutes. Please note that National Grid have advised these times are approximate and may vary on the day.\r\n\r\nSaxon House is equipped with both Uninterruptible Power Supply (UPS) systems and backup generator capacity. In the event of mains power loss, UPS will provide immediate seamless protection and the generator will take over for the duration of the outage. We do not anticipate any disruption to services.\r\n\r\nHowever, in line with our operational procedures, we are classifying this period as AT RISK. Any period of operation on backup power carries an elevated risk profile compared to normal mains-fed operation.\r\n\r\nAn electrical engineer will be on site for the duration of the maintenance window to monitor all systems and ensure a smooth transition to backup power and back to mains supply.\r\n\r\nIf you have any questions or concerns, please contact our operations team.\r\n\r\nDate: Tuesday 7th April 2026\r\nWindow: 07:00 \u2014 09:00 (approximate)\r\nExpected Outage Duration: Up to 30 minutes\r\nImpact: Mains power disconnection \u2014 facility operating on UPS\/Generator\r\nRisk Level: At Risk\r\nNational Grid Ref: INCD-18418-I","portuguese-br":"","german":""}]]></description>
</item>
<item>
<title>{"english":"Scheduled Power Maintenance \u2014 Saxon House \u2014 At Risk Period \u2014 27th March 2026","portuguese-br":"","german":""}</title>
<link>status/27/--english---scheduled-power-maintenance--u2014-saxon-house--u2014-at-risk-period--u2014-27th-march-2026---portuguese-br------german-----/</link>
<guid>status/27/--english---scheduled-power-maintenance--u2014-saxon-house--u2014-at-risk-period--u2014-27th-march-2026---portuguese-br------german-----/</guid>
<pubDate>Fri, 27 Mar 2026 00:00:00 +0000</pubDate>
<description><![CDATA[{"english":"We have been notified by National Grid that they will be carrying out planned maintenance on the electricity substation serving Saxon House on Friday 27th March 2026 between 07:00 and 08:00. During this work, mains power to the facility will be temporarily disconnected. Please note that National Grid have advised these times are approximate and may vary on the day.\r\n\r\nSaxon House is equipped with both Uninterruptible Power Supply (UPS) systems and backup generator capacity. In the event of mains power loss, UPS will provide immediate seamless protection and the generator will take over for the duration of the outage. We do not anticipate any disruption to services.\r\n\r\nHowever, in line with our operational procedures, we are classifying this period as AT RISK. Any period of operation on backup power carries an elevated risk profile compared to normal mains-fed operation.\r\n\r\nAn electrical engineer will be on site for the duration of the maintenance window to monitor all systems and ensure a smooth transition to backup power and back to mains supply.\r\n\r\nIf you have any questions or concerns, please contact our operations team.\r\n\r\nDate: Friday 27th March 2026\r\nWindow: 07:00 \u2014 08:00 (approximate)\r\nImpact: Mains power disconnection \u2014 facility operating on UPS\/Generator\r\nRisk Level: At Risk\r\nNational Grid Ref: INCD-18418-I","portuguese-br":"","german":""}]]></description>
</item>
<item>
<title>{"english":"Partial IP outage","portuguese-br":"","german":""}</title>
<link>status/26/--english---partial-ip-outage---portuguese-br------german-----/</link>
<guid>status/26/--english---partial-ip-outage---portuguese-br------german-----/</guid>
<pubDate>Thu, 12 Mar 2026 00:00:00 +0000</pubDate>
<description><![CDATA[{"english":"We are currently exoeriencing a partial outage effectng a small number of IP ranges, We are investigsting and wil update this notification soon.","portuguese-br":"","german":""}]]></description>
</item>
<item>
<title>{"english":"UPS B Maintenance Notification \u2013 Battery Upgrade & Resilience Improvement","portuguese-br":"","german":""}</title>
<link>status/25/--english---ups-b-maintenance-notification--u2013-battery-upgrade---resilience-improvement---portuguese-br------german-----/</link>
<guid>status/25/--english---ups-b-maintenance-notification--u2013-battery-upgrade---resilience-improvement---portuguese-br------german-----/</guid>
<pubDate>Tue, 10 Mar 2026 00:00:00 +0000</pubDate>
<description><![CDATA[{"english":"Following our previous communications regarding the investigation into the B Feed UPS behaviour during recent brownout events, we are now proceeding with the planned resilience upgrade to the UPS B battery system.\r\n\r\nAs previously advised, our investigation concluded that the most probable contributing factor to the UPS response during the voltage disturbance was degradation within the existing battery string. To address this and improve system resilience, we will be upgrading UPS B to operate with dual battery strings.\r\n\r\nUpgrade Overview\r\nWe have now received the required battery systems, consisting of two full battery strings (80 batteries in total). The remaining upgrade components are confirmed to be arriving on Monday, enabling us to proceed with the planned installation.\r\n\r\nOnce complete, UPS B will operate with:\r\n\t\u2022\tTwo battery strings (80 batteries total)\r\n\t\u2022\tIncreased redundancy within the battery system\r\n\t\u2022\tImproved resilience during supply disturbances\r\n\r\nMaintenance Window\r\nThe upgrade works are scheduled as follows:\r\n\r\nDate: Tuesday 10th March\r\nStart Time: 10:00\r\nEstimated Duration: Up to 6 hours\r\n\r\nDuring this maintenance period, UPS B will be taken offline in order to complete the upgrade works.\r\n\r\nOperational Impact\r\nDuring the works:\r\n\t\u2022\tCircuit B will remain connected to mains power but will not have UPS battery protection.\r\n\t\u2022\tIn the unlikely event of a grid power disturbance during this window, equipment connected solely to the B Feed may experience interruption.\r\n\t\u2022\tCircuit A will remain fully operational and protected by UPS at all times.\r\n\r\nWhile no issues are expected during the works, the B Feed should be considered \u201cat risk\u201d for the duration of the maintenance window.\r\n\r\nCustomer Guidance\r\nCustomers operating single-powered equipment connected to the B Feed should consider their equipment at risk during the maintenance period.\r\n\r\nIf you are unsure whether your equipment is connected to the B Feed, please respond to this notification and we will be happy to confirm your current power configuration.\r\n\r\nEngineering Works\r\nOur engineering team will carry out the works on-site, and a UPS specialist engineer will be on hand throughout the maintenance window. The work will be completed as efficiently as possible in order to minimise the period during which the B Feed is without battery protection.\r\n\r\nWe appreciate your continued patience while we implement this upgrade, which will strengthen the resilience and redundancy of the B Feed UPS system.\r\n\r\nIf you have any questions or would like to discuss mitigation options, please do not hesitate to contact us.\r\n\r\nKind regards,\r\n\r\nNOC Team\r\nBlynx AIM Ltd","portuguese-br":"","german":""}]]></description>
</item>
<item>
<title>{"english":"Planned Network Maintenance \u2014 7th & 8th March 2026","portuguese-br":"","german":""}</title>
<link>status/24/--english---planned-network-maintenance--u2014-7th---8th-march-2026---portuguese-br------german-----/</link>
<guid>status/24/--english---planned-network-maintenance--u2014-7th---8th-march-2026---portuguese-br------german-----/</guid>
<pubDate>Sat, 07 Mar 2026 00:00:00 +0000</pubDate>
<description><![CDATA[{"english":"We are writing to inform you of planned network maintenance at our Saxon House data centre facility on the weekend of 7th and 8th March 2026.\r\n\r\nWhat is happening?\r\n\r\nWe are decommissioning our legacy Juniper routing infrastructure as part of an ongoing programme to modernise and improve the resilience of our core network. During this work, obsolete equipment will be removed from the network, and any services still carried by the legacy platform will be migrated to our new infrastructure.\r\n\r\nWhen?\r\n\r\nMaintenance window: Saturday 7th March \u2013 Sunday 8th March 2026\r\nRisk window: Saturday 7th March, 20:00 \u2013 Sunday 8th March, 08:00\r\n\r\nWhat to expect\r\n\r\nNo service interruption is expected within the data centre during this maintenance window. However, all network services should be considered at risk for the duration of the risk window.\r\n\r\nCustomers with connectivity to our Telehouse location should be aware that there may be a brief interruption during the cutover to the new platform. The data centre itself is expected to continue operating normally throughout.\r\n\r\nAll efforts will be made to keep any disruption to an absolute minimum.\r\n\r\nDo I need to do anything?\r\n\r\nNo action is required on your part. We recommend that you make your technical teams aware of the maintenance window as a precaution.\r\n\r\nContact\r\n\r\nIf you have any questions or concerns, please reply to this notification or contact our operations team on 01242 234567.\r\n\r\nWe appreciate your patience and understanding as we continue to invest in the reliability and performance of our network.\r\n\r\nKind regards,\r\nBlynx AIM Limited\r\nData Centre Operations \u2014 Cheltenham","portuguese-br":"","german":""}]]></description>